Skip to content
Menu
New West Durrington Residents Association
  • Home
  • Local Business Directory
  • Useful Contacts
  • Register
  • Login
New West Durrington Residents Association

Category: Civil Engineering Works

Civil Engineering Works

! – PLANNED ROAD CLOSURE

Posted on March 25, 2021March 26, 2021 by admin

Dear Members We are flavour of the month at the minute Please see attached a letter notifying yourselves of essential works to the Bellflower Drive tabletop within the West Durrington development programmed between Monday 19th April to Wednesday 28th April. Disruption includes road diversions, closures and the temporary opening of the Cherwell Road link all…

Continue Reading

Demarcation Ramps on Sunflower Street, WaterLily Way and BellFlower Drive

Posted on March 19, 2021March 25, 2021 by admin

Along Sunflower Street there are two table tops (block paving) to be constructed. There is this one between Sunflower Street,Bellflower Drive,Water Lily Way. The next one is Sunflower Street and Celandine Road. In both cases the scenario shown in this post will be present as the tabletop when completed is the same height as the…

Continue Reading

Raising Drainage Covers

Posted on March 9, 2021March 9, 2021 by admin

John Reilly’s are raising drainage covers along Sunflower Street from Snapdragon Lane to Fulbeck Avenue in preparation for tarmac.

Continue Reading

About This Site

Members of the New West Durrington Residents Association can find up to date information on the development but also useful contact details of developers, maintenance company and businesses on site

©2025 New West Durrington Residents Association | Theme: Wordly by SuperbThemes